360 Energy Liability Management Ltd.
360 Energy Liability Management Ltd.
Calgary, Alberta, Canada
Published

Translation of App Developed in Teams to Power Apps for Cloud Deployment

We currently have an app which was designed in JS for deployment in Microsoft Teams. We would like to move this app to Power Apps or Azure Apps for cloud deployment such that our individuals who use the app do not have to install multiple programs locally (which are currently required for the Teams App).

Admin Chantelle Carley
Matches 1
Category Cloud technologies + 1
Closed
Published

360 ELM User Interface and Automation Development Project

The goal of this project is to create a user interface to gather wellsite location data and licenses from the user, input this data into a public database to get data on specific variables and then run this data through existing R code to generate predictions. These predictions should be returned to the user through an excel spreadsheet or csv file.

Admin Chantelle Carley
Matches 1
Category Cloud technologies + 2
Closed
Published

Safety Mobile App Development

We would like students to develop a mobile application which can be used on both iOs and Android through which personnel have the ability to select their task, have the applicable forms for those tasks appear and then fill in the forms through the app which would then be saved in our SharePoint drive. •360 currently has field personnel email in copies of their safety forms. These are sent in various formats, electronic forms, photos of printed forms, saved pdf files or scans of printed forms.•These forms are then filed in a Sharepoint folder and are recorded as submitted in an excel tracking spreadsheet.•This is a time consuming and inefficient process as forms are often not filled out correctly, not named properly and data for analytics is not easily retrieved.Ultimately, students will be developing the app to replace the existing process right from inception through testing and completion.

Admin Chantelle Carley
Matches 1
Category Software development + 4
Closed
Published

Environmental Technologist

For every well, pipeline, facility or site at the end of its productive lifespan, 360 is there to help understand costs, manage obligations and define risks – and as a result, make closure simple. The environment team at 360 focus on achieving regulatory closure from the Phase 1 Environmental Site Assessment (ESA) phase through to reclamation. Our list of environmental services include ESAs, remedial action plans, spill response, wildlife assessment, groundwater monitoring programs and much more. See our website to read an extended list of services.Starting with the basics, the project will provide the student exposure and practical experience at the Phase 1 ESA level including aerial photograph review/drafting, historical records review, report writing, and other tasks as requested. The student will participate in a large scale Western Canada upstream closure project working under the supervision of the project manager. The student will have the opportunity to connect and engage with environmental professionals working within the Alberta Energy industry.The project is anticipated to be delivered remotely with the help of Microsoft Teams.

Admin Cole Rippe
Matches 1
Category Engineering - general + 3
Closed